top of page
ARC 110- Group build

in this project we were tasked to design a wind shelter for mount pleasant Eco Park focusing on a sustainable building method.

to start we each designed our own proposal an presented them to the client and peers, then a vote was held to decide the one that we would develop and build.

the basis for the chosen proposal was a grid shell structure that would be clad with thatch or some other material. 

Screen Shot 2019-02-10 at 13.03.00.png

© 2020 by CLM-Architecture

bottom of page